How to use Cement, sand and aggregate calculator
- 01Pick the mixConcrete grade or mortar ratio.
- 02Type the volumem³, cft or yd³.
- 03Read the materialsCement bags, sand, crush.

Dry volume, then shares.
Wet concrete shrinks as cement fills the gaps between sand and stone, so site engineers multiply the wet volume by 1.54 (1.33 for mortar) to get the dry materials. That dry volume is split by the ratio, and the cement share is turned into kilograms at 1,440 kg/m³ and then into bags.
At a glance
- Price
- Free. No sign-up, no watermark.
- Privacy
- Your text stays in your browser. Nothing is uploaded.
- Works in
- Chrome, Edge, Firefox and Safari, on phones and computers
Questions
How much cement, sand and aggregate for 1 m³ of 1:2:4 concrete?
Dry volume is 1 × 1.54 = 1.54 m³ and the parts add up to 7. Cement is 1.54 ÷ 7 = 0.22 m³ = 316.8 kg, or 6.34 bags of 50 kg. Sand is 0.44 m³ (15.5 cft) and aggregate 0.88 m³ (31.1 cft).
Why multiply by 1.54?
Loose sand and stone have air between the grains, and some material is lost. Experience shows about 54% more dry material than finished concrete, so 1.52–1.57 is used; 1.54 is the common figure in India and Pakistan.
Which mix should I use?
M7.5 or M10 (1:4:8, 1:3:6) for blinding and bedding, M15 (1:2:4) for floors and light work, M20 (1:1.5:3) for slabs, beams and columns in houses. IS 456 limits nominal mixes to M20; stronger concrete needs a design mix.
Is what I type sent anywhere?
No. The calculation runs in your browser and nothing you type leaves your device.